AIS|Grid

AIS|Grid Inspection Report (conceptual)

This represents the intended AIS|Grid inspection output, demonstrating how field imagery can be translated into structured findings that support efficient post-work compliance review.

Inspection Data

Work orderWO54125321
AreaFeeder C241-Clearwater Sub
Date of Inspection2026-01-05
Images reviewed5
Company Performing WorkAcme Electrical Contractors
Specifics can be adjusted as desired by end user during pilot build-out.

Summary

Inspection Result
92%
Flagged for potential review
8%
Detected built components
11
Standards Reviewed
2
Pass/Fail/Review thresholds will be set by end user during pilot build-out. Auto referral thresholds, manual review thresholds, or other flagging baselines to be set by individual end user.

Detected components

ComponentCountStatus
Poles (wood/cte)2Tagged
Street Light1Tagged
Trunion Clamp3Tagged
Insulators3Tagged
Deadend Shoe2Review

Flags and Exceptions

TypeCountNotes
Potential clearance issue3Primary Spacing
Condition anomaly4Possible missing secondary hardware
Incorrect installation6Location of service deadend
AIS|Grid is designed to augment current manual inspections to generate greater visibility for customers. Review and verification thresholds are adjustable during build-out.

Visual evidence

Field photo submitted by crew
Photo submitted by crew in field
AIS|Grid inspected image result
Inspected image result from AIS|Grid
AIS|Grid inspection output with applied specs for reference
Inspection output view showing the applied specification reference used to evaluate the finding.
Preliminary product output. Not an engineering determination. Intended to support consistent review and documentation.